
Interested In This Footage?
More Parts For Montrose Windfarm Scotland Mavic 4 Pro
- 14 days ago
- 126 VŪZ
6 




- 4
- Report
Now under construction, Inch Cape will feature 72 turbines sited in the North Sea, 15 kilometres off the Angus coast. The power it generates will be transported 85 kilometres to a new substation in East Lothian from where it will enter the national transmission system. It will be operated out of a purpose-built facility at Montrose Port. Inch Cape will make a significant contribution towards the UK’s offshore wind ambitions and will generate enough green energy to power the equivalent of more than half the homes in Scotland
Up Next
Autoplay
Edinburgh Castle Scotland

- Jaybee2786
- 772 VŪZ
5 - 12
- about 1 year ago
Entrance to the Hidden Valley Glen Coe Scotland, Mavic 3

- Jaybee2786
- 658 VŪZ
0 - 0
- almost 2 years ago
Kissing Bridge Longest Covered Bridge in Ontario
- playadave
- 658 VŪZ
10 - 1
- about 5 years ago
Entry and exit to The Lost Valley Coire Gabhail, Glen Coe Scotland, DJI Mavic Pro 2 4K OR 1080P

- Jaybee2786
- 1.1k VŪZ
10 - 14
- about 6 years ago
Seacliff to Tantallion Castle Scotland. Mavic 3

- Jaybee2786
- 877 VŪZ
8 - 9
- over 2 years ago
Above Scotland // An Aerial Perspective

- digitaltriangle
- 9.3k VŪZ
68 - 41
- almost 9 years ago
HIGHLANDS/SCOTLAND / PHANTOM 4 PRO

- 100448021432531210...
- 1.8k VŪZ
34 - 21
- about 8 years ago
The Quiraing Skye Scotland. Mavic 2 Pro 2021 (No Editing At All) camera set to normal

- Jaybee2786
- 1.2k VŪZ
4 - 5
- almost 3 years ago
St Andrews Square Edinburgh Scotland Mini 4 Pro

- Jaybee2786
- 1.2k VŪZ
5 - 8
- almost 2 years ago
Stirling Castle Scotland Mini 3 PRO

- Jaybee2786
- 1.2k VŪZ
5 - 2
- over 3 years ago